write scope behind a schedule: Security condition 1 amended, a fifth condition added, `pin-bump-publish` enumerated
2026-10-02 · settled · DECISIONS.md line 6174
Maintainer ruling, stated in conversation by the author; landed by this dispatch as its first act. Two changes to AGENTS.md Security. Condition 1 on a write-scoped job now reads: it triggers on push to a protected branch, on schedule, or on workflow_dispatch with the job guarded to main; never on pull_request. A scheduled run executes on the default branch by construction, so it is as far from contributor reach as a push to main; a manual dispatch may name any ref, which is why the guard sits on the job and tests/workflow_scope.py reads it there (in the one form it reads: a job-level if: comparing github.ref or github.ref_name to a protected branch). A fifth condition is added: a write-scoped job runs no build and executes nothing from the proof layer or from a dependency; it handles files as data. The gate enforces the amended condition 1 and its self-test pins each new direction (a schedule passes, a guarded dispatch passes, an unguarded or wrongly guarded dispatch fails, a guard on a different job does not count); condition 5 is a review matter read against the step list, like the second half of condition 2.
The occasion is .github/workflows/pin-bump.yml: a monthly trial (the 8th, and on dispatch) of moving lean/lakefile.toml to the head of Formalized-Agent-Foundations main. pin-trial runs at contents: read — rewrites the rev, copies that repository's lean-toolchain, runs lake update agentFoundations, lake exe cache get, lake build and tests/audit_axioms.py, records the build wall time, uploads the three bumped lean/ files, and on success saves .lake under the key the lean job will compute for them. pin-bump-publish (contents and issues write, enumerated with a write-scope marker, guarded to main, no toolchain) verifies the artifact as data — the lakefile differs from main only in the rev line, the rev is the head of that repository's main as the job itself resolves it, the toolchain equals the dependency's at that rev, every manifest entry matches the dependency's own manifest at that rev — then force-pushes one signed-off commit to the branch bot/pin-bump and opens or updates the issue pin bump ready; a red trial or a failed verification pushes nothing and opens or updates pin bump blocked. The logic is .github/pin_bump_publish.py. The workflow never opens a pull request and never touches main; the maintainer opens the pull request from the branch, and that opening is the review that means reading. .github/branch-protection.json and tests/path_gate.py are unchanged: no required check is added, and the pin files were already specification paths.
Budget. The trial's build runs under its own timeout-minutes: 150 (job timeout 170), deliberately above the lean job's 25 minutes because the trial builds the dependency cold. That is a specification-layer value under the trust chain item 7, recorded here; the lean job's budget does not move.
Rejected alternatives: (a) letting the workflow open the pull request — that needs pull-requests: write and makes a bot the author of a specification-layer change whose review must mean reading; the branch-plus-issue shape keeps the maintainer's act where the constitution puts it. (b) Letting the write-scoped job re-run the build or the axiom audit to "double-check" before pushing — that is exactly what condition 5 forbids: the token would be in the hands of whatever lake elaborates. (c) Reading the job guard in every expression form GitHub accepts — the gate reads one form on purpose, so a guard a reviewer cannot recognise at sight is a finding rather than a pass.
Touches
- item 7