Item 19: Triangle compatibility audit
Deference line — first research wave · difficulty substantial · project deference · open · node item-19
— returned wave 1
Whether the requirements the forward arrow imposes and the requirements the reverse arrow imposes can hold simultaneously. Audit timing, advisory access, information flow, settlement, reference-process identity, seals, causal influence, trader populations, admissibility, and update timing.
Deliverable shape: a compatibility matrix, not a theorem — every row classified compatible, conditionally compatible, incompatible, or unresolved, each with its evidence. Acceptance check: every listed interface appears as a row with a classification and a stated evidence basis; no row is classified compatible on the strength of an assumption introduced to close it.
Context: prompts/2026-08-11-deference-triangle/REPORT.md; projects/deference/note-dump-2026-08-11/lean-deference/AUDIT.md. A solution ships: the matrix, and for every conditionally compatible row the exact condition. Not permitted: turning unresolved into compatible by assumption, or inventing reverse-arrow assumptions to close the table.
Deliverable shape: a compatibility matrix, not a theorem — every row classified compatible, conditionally compatible, incompatible, or unresolved, each with its evidence.
Acceptance check: every listed interface appears as a row with a classification and a stated evidence basis; no row is classified compatible on the strength of an assumption introduced to close it.
Context: projects/deference/note-dump-2026-08-11/lean-deference/AUDIT.md; prompts/2026-08-11-deference-triangle/REPORT.md
Registered results bearing on this item
None registered.
Where it hangs
- held by deference-and-trust
Rounds and decisions that touch it
None recorded.