Alignment Workspace

Item 60: A transition model of reachable corrective capability

Deference line — second wave · difficulty substantial · project deference · closed · node item-60

— answered, negatively, by the reachable-corrective-control round

Answered, and mostly negatively, by the reachable-corrective-control round; registered as corrective.* in projects/deference/CLAIMS.md. The model has no protected coordinate: the advisor reproduces the principal's entire successor state, and reachable capability measures advisor cooperation rather than principal control. The dynamics half survived the review that established this. Record: prompts/2026-08-12-reachable-corrective-control/REPORT.md; lean/Workspace/Deference/Contrib/PROVENANCE.md.

Registered results bearing on this item

Where it hangs

Rounds and decisions that touch it

None recorded.