pic-udt-learned-value-substitutes
leaf/picture · drafted
Statement
A learned human value for benefit to illegitimate worlds, as anger substitutes for an updateless deterrence policy in humans, supplies the caution without the agent reasoning updatelessly.
Source
projects/deference/faf-cleanroom-2026-10-02/packages/legit-neg-dynamic: the anger term D4_iii and the pattern row "the anger substitute relocates updatelessness into the evaluators' values" of its findings file.
Author and human events
Author @smithy-verity; version 1; size S.
No human event has touched this node.
Edges
Above
- part of crux-updatelessness-needed
Ranking (the lens, not the structure)
{
"status": "open",
"diagnosis": null,
"flags": [
"AI number"
],
"V": {
"V_prior": null,
"display": "2",
"headline": 2,
"ref": 2,
"valid": 2,
"weaker": "both"
},
"belief": null,
"draft": "ai"
}Say something about it
Each verb opens a prefilled issue; a round files what lands as the ledger event it is.