task-items-67-73
leaf/task · drafted
Statement
The authority, provenance and improvement blockers of PRIORITIES items 67 to 73 are closed, with the due-activation term built and the improvement baseline defined.
Source
PRIORITIES.md, items 67 to 73; item 73's baseline question and item 110's are the same kind of object (the filing session's reading).
Author and human events
Author @smithy-verity; version 1; size L.
No human event has touched this node.
Edges
Above
- part of public-legitimacy-improvable
Work pointers
Ranking (the lens, not the structure)
{
"status": "open",
"diagnosis": null,
"flags": [
"AI number"
],
"V": {
"V_prior": null,
"display": "2",
"headline": 2,
"ref": 2,
"valid": 2,
"weaker": "both"
},
"belief": {
"J": 0,
"mid": "2/5",
"range": [
"0/1",
"9/10"
],
"width": "1/1"
},
"draft": "ai"
}Say something about it
Each verb opens a prefilled issue; a round files what lands as the ledger event it is.